Disaster recovery construction of Kijio river in Marumori

​ Kijio River disaster recovery work

Construction site Marumori Town, Igu District, Miyagi Prefecture

Construction area Law revetment work A = 7,066㎡

Construction amount River excavation V = 5,939 m3

​ Completion 2022 February

雉子尾川河川災害復旧工事
Kikoo River disaster situation

​5 section before construction

​6 section before construction

Kikoogawa Ouchi area 5th construction area

​5 section construction area completed

Concrete block

​A=2,976㎡

Kikoo River Ouchi area

​7 section construction completed

Concrete block

​A=1,272㎡

Kikoo River 7th construction area Ouchi area

​7 section construction status

Channel excavation

​ block product

Kishio River 2nd section disaster restoration work

​2 section  construction status

Channel excavation

Foundation block installation

​Slope embankment shaping

Kikoo River Ouchi area 2nd construction area

​2 section completed

Concrete block

​A=1,409㎡